Stockton sports hall
Here are two pictures from a job we did in Stockton. Left is the subfloor prep and right is after the installation be prior to line marking.
Click to enlarge images.
Bournemouth School
Here are some pictures from a job we did in Bournemouth in the summer. Left is finished floor prior to line marking, centre is the weld joint and right is a fitted Volley ball sockets required by England volley ball.
Click image to enlarge.
New floor at Chesterfield
During the Floor installation on the left
and then the finished floor on the right.
Click on image to enlarge.